CARC web archive · Archived copy of ahpcc.unm.edu/projects/vista-azul/proposal/node27.html as captured by the Internet Archive on 22 February 2001. Links to pages that were not saved here go to the Wayback Machine. Icons the Internet Archive did not save were redrawn for this copy and are not originals (hover over one to see). Wayback copy · All pages in this snapshot · Web archive index
next (modern recreation, not an archived original) up (modern recreation, not an archived original) previous (modern recreation, not an archived original)
Next: Final configuration, 3Q 2000 Up: Summary Of IBM Equipment Previous: Netfinity Commodity Cluster, 4Q

SP Winterhawk-II Cluster, 2Q 2000


SP Trailblazer Switch with 32 ports to support

8 Winterhawk-II Power3 SMP nodes
8 Netfinity nodes
SGE adapters
Ascend router
8 Winterhawk-II SMP nodes with 4 processors per node
4 Gbytes RAM per node
38 Gbytes disk per node (2 disks)
RedHawk Switch Adapter per node
1 Gigabit Ethernet adapter on one node
1 Tower to hold switch and 8 SMP nodes
SGE Frame Buffer
4 Trailblazer switch adapters (8 connections to the Trailblazerswitch)
8 RGB Outputs
Memory as needed
Delivered to MHPCC will be
SGE Frame Buffer
4 switch adapters (gives 8 switch ports)
8 RGB output ports
Memory as needed



Bob Ballance
1999-12-07