CARC web archive · Archived copy of ahpcc.unm.edu/NewsPress/LosLobos.html as captured by the Internet Archive on 3 September 2000. Links to pages that were not saved here go to the Wayback Machine. Grey boxes mark images that were never archived. Wayback copy · All pages in this snapshot · Web archive index

Image not archived

 

Los Lobos gets ready to HOWL!

 

 

April 28

IT'S HERE! Boxes begin to be stacked high as they await the technical team.

Image not archived

 

May 1

The technical team from IBM starts assembling LosLobos. The table below served as an efficient assembly line. The floor was transformed into a forest of racks. LosLobos's 14 racks will hold 256 nodes.

Image not archived Image not archived

 

May 4

The nodes are assembled. They were stacked while awaiting installation. Space is a premium at the AHPCC.

Image not archived

 

May 5

The IBM technical team rips open the Myrinet shipment. They immediately begin preparing for installation.

Image not archived Image not archived

 

May 8

The nodes begin to be inserted into the racks. The process takes approximately 5 minutes per node. That does not include the cabling.

Image not archived

 

May 9

The process of inserting the nodes into their racks is completed. The technical team has assigned install and cabling duties amongst themselves. The cabling process begins. The nodes are powered on for the first time.

Image not archived

 

May 10 and Beyond

The cabling process continues. It is going smoothly, but takes diligence.